Profiling MLS Training Facilities


Continuing with my exploration of how MLS teams stack up against one another off-field, this piece is examining where each team spends most of its time: their training facilities. This is where teams practice the week and prepare for each game. Similar to my stadium article, I am going to group these training facilities into a loose ranking by tiers. For each training facility I include the “Name of Facility (Team) – Year it’s been in use by that team and how much it cost to build the facility or if it is leased”

Children’s Healthcare of Atlanta Training Ground (Atlanta United) – 2017

Estimated total investment: $60 Million

From Atlanta’s Website: “a 33-acre site featuring a 30,000 square- foot headquarter building and six full-size fields including three natural grass and three FieldTurf surfaces.

Additional highlights of the training ground include:

First team locker room with 22-foot ceilings and 14 elevated windows
Six Academy Locker Rooms
Full service kitchen and dining room with balcony access
Show pitch featuring a 2,500-seat stand and separate Pavilion for viewing
Sport science facilities including double height gym and two hydrotherapy plunge pools
Entrance artwork created by renowned South African artist Marco Cianfanelli”.

CIBC Fire Pitch (Chicago Fire) – 2015

Estimated total investment: $20 Million

From Chicago’s Website: “On Dec. 8, 2015, Chicago Fire Soccer Club Owner and Chairman Andrew Hauptman joined with team supporters, partners and city officials to officially open CIBC Fire Pitch (formerly The PrivateBank Fire Pitch), located adjacent to the Chicago River at Addison and Talman on the city’s northwest side. The 125,000-square-foot complex is the city’s premiere facility for year-round soccer and is open to the public and soccer players from across the region. The $20 million project features both indoor and outdoor fields, serves as an indoor practice site for the Chicago Fire Soccer Club first team and houses games for youth and adult recreational leagues”.

Obetz Practice Facility (Columbus Crew) – 1997

Estimated total investment: Leased

The Crew’s website doesn’t have a page describing their training facility. From what I gather, they practice in Obetz, Ohio at the EAS Training Center. There are two grass fields, a locker room, some offices, and a weight room. They do not own the land they play on and their lease runs out at the end of 2018. Rumor has it that the new Crew ownership wish to turn MAPFRE Stadium into the team’s training grounds once a new downtown stadium is built.

Dick’s Sporting Goods Park Complex (Colorado Rapids) – 2007

Estimated total investment: $130 million (Stadium included)

From Colorado’s Website: “consists of 24 full-size, fully-lit sports fields, including 22 natural grass and 2 synthetic turf fields” and it looks like they also have indoor meeting spaces as well”.

Loudon County Training Facility (DC United) – 2019-2020

Estimated total investment: The land costs $23 Million, the town is set to pay for $15 million in infrastructure but that’s mostly going to roads, parking lots etc. So with no official number we’re looking at something like $40+ Million (Pure conjecture, don’t quote me on that).

DC currently practice at some Auxiliary fields near RFK, but have plans to create a training facility in Northern Virginia where their new USL team will also play.

From Soccer Stadium Digest: “The project is slated for Philip A. Bolen Memorial Park, which would become the site of a complex that includes a stadium for Loudoun United FC–a new United USL club that has been announced as a 2019 expansion team. Along with four fields (two reserved for the team, two open to public use), the complex would include offices, a training facility, and a modular stadium with a capacity of 5,000 seats. As part of the plan, Loudoun County would lease the land to D.C. United and provide $15 million in financing on the facility, which would be paid back by United”.

Mercer Health Training Facility (FC Cincinnati) – 2019

Estimated total investment: $30 Million

From Cincinnati’s website: “the $30 million, 24-acre facility will include three full-size, lighted soccer fields – including two stabilized natural grass surfaces and one synthetic turf surface – as well as a goalkeeper-specific training area.

The MLS team will be housed in a 30,000 sq. ft., multilevel building abutting the fields, while the FCC Academy teams will utilize a separate 4,000 sq. ft. wing of the building. Additionally, there will be a 3,000 sq. ft. maintenance facility on the property”.

Toyota Soccer Center (FC Dallas) – 2005

Estimated total investment: $39 Million

From Dallas’ website: “Toyota Stadium also includes seventeen regulation sized soccer fields known as the Toyota Soccer Center which are utilized year-round on a daily basis”.

Houston Sports Park (Houston Dynamo) – 2011

Estimated total investment – Leased

From Houston’s website: “the permanent home and professional training center for the Dynamo first team and youth academy. The multi-field soccer facility is located off State Highway 288, approximately 10 miles south of the Dynamo’s new downtown stadium site … includes seven soccer fields, field lights, and parking”.

StubHub Center (Los Angeles Galaxy) – 2003

Estimated total investment – $150 Million (Stadium included)

From the StubHub Center website: “StubHub Center, home of the LA Galaxy … Managed by AEG Facilities, the $150 million, privately financed facility was developed by AEG on a 125-acre site on the campus of California State University, Dominguez Hills (CSUDH) in Carson, California. StubHub Center features an 8,000-seat tennis stadium, a 30,000-seat stadium for soccer, football and other athletic competitions and outdoor concerts; a 2,000-seat facility for track & field and a 2,450-seat indoor Velodrome – the VELO Sports Center – for track cycling. StubHub Center is home to Major League Soccer’s LA Galaxy, the five-time MLS Cup Champions. StubHub Center is also home to the United States Tennis Association’s (USTA) High-Performance Training Center, the national team training headquarters for the U.S. Soccer Federation (USSF) and EXOS, an international training center for elite and professional athletes”.

LAFC Training Facility (Los Angeles FC) – 2018

Estimated total investment: $30 Million

From Angels on Parade’s website: “The $30 million facility, which includes offices, training facilities, hydrotheraphy tubs and a lush field that matches the team’s grass at Banc of California Stadium, will be their permanent training home after playing at UCLA while construction was being completed.

In addition to the first team, LAFC’s academy will also be housed at the facility. The academy has been training at Cal State LA since its establishment in 2016″.

National Sports Center (Minnesota United) – 2017

Estimated total investment: Leased

Minnesota currently use the National Sports Center as their training facility and have plans to renovate part of it. From fiftyfiveone’s website: “there would be no physical build-out. Instead, the lower southeast corner of the Sports Hall,  a 10,000 sq. ft. area, would be totally renovated specifically for the team’s use. The remodel of the facility will also include a player lounge, new exercise equipment, weight rooms, an office, and a rehab/trainers area”. Strangely enough, this is the only one I’ve personally been to.

Centre Nutrilait (Montreal Impact) – 2016

Estimated total investment: $16 Million

From Montreal’s website: 2 grass fields, 2 turf fields, locker rooms, class/conference rooms, weight rooms, “relaxation rooms”, etc.

Red Bulls Training Facility (New York Red Bulls) – 2013

Estimated total investment: $6 Million (doesn’t include 2 additions made since 2013).

From New York’s website: “The 15-acre center features [four] fields – [three] grass, one turf … includes a lounge area, cafeteria, fully-loaded gym, locker rooms for both the Red Bulls and a visiting team, and offices for members of the coaching staff and front office. Additionally, one of the grass fields (the center field) has a heating system underneath it that allows the club to train even when it snows” (one grass field was added in 2017).

Etihad City Football Academy (New York City FC) – 2018

Estimated total investment: Truly can’t find anything, if I had to guess, I’d say $30 Million (Pure conjecture, don’t quote me on that).

From NYCFC’s website: “Performance areas include: post-exercise aquatic recovery area, gym, boot room, massage and medical treatment rooms, team meeting room, kit storage, laundry, showers and restrooms. The gym has been designed to be big enough to accommodate a full team pre-activation … The soccer pitch is usable all year-round due to undersoil heating capability. The pitch also includes a state-of-the-art camera analysis system that is used to record every training session and inform the coaches’ data analysis of player performance”.

Unnamed Facility (New England Revolution) – 2019

Estimated total investment: $35 Million

From MLSsoccer.com: “A first team and academy training facility on the broader Gillette Stadium property. Situated in the woods and adjacent to several wetlands, the Revs’ 30,000 foot-plus complex will cost $35 million and feature four fields – including a grass pitch the first team already utilizes”.

Osceola Heritage Park (Orlando City SC) – 2019

Estimated total investment: $12 million

From Orlando’s website: “20 acres, featuring four full-size grass fields, a fitness, training and recovery center, a film review room along with a players’ lounge and dining area. Two main locker rooms for City and Pride will be designed to be near replicas of the home locker room at Orlando City Stadium, helping players transition seamlessly from one home to the other. Additionally, the secured facility will have 30,000 square feet of office space for working staff and facilities to support media operations”. Until the opening of the facility, Orlando will continue to train at a leased facility.

Power Training Complex (Philadelphia Union) – 2016

Estimated total investment: Truly can’t find anything. If I had to guess I’d say $10 Million at most. (Pure conjecture, don’t quote me on that).

From the Union’s website: “… include[s] two regulation sized training fields of Bermuda grass and a state-of-the-art indoor facility … adjacent Talen Energy Stadium … The 16,500 square foot indoor facility includes a weight training area, physical therapy and sports science development area, nutrition center, locker rooms, state of the art video theatre and a players’ lounge. The Power Training Complex also houses the offices for Philadelphia Union coaches and support staff”.

adidas Timbers Training Facility (Portland Timbers) – 2012?

Estimated total investment: $6 Million

From Portland’s website: “The training center, located … approximately 10 minutes from Providence Park, includes a new natural-grass field … and a synthetic, FieldTurf field designated for public use … features a 6,000-square-foot indoor facility that includes locker rooms for the Timbers first team and development teams, fully equipped training and fitness areas, offices and a spacious lounge/common area for Timbers players.

Zion Bank Real Academy (Real Salt Lake) – 2017

Estimated total investment: $60 Million

From RSL’s website: “Located on a 132-acre plot … just 20 minutes west of Rio Tinto Stadium … also includes the 5,000-seat Zions Bank Stadium, home of the USL Real Monarchs … amenities include a total of 10 fields including the Stadium, with one each for … public use and a total of seven (7) regulation-size training fields. Four of the fields will be natural grass and outdoor, with the remaining three fields utilizing a state-of-the-art artificial surface … Two of the artificial fields will be housed in the Zions Bank Training Center‘s iconic 208,000 sq-ft. indoor structure, the largest pre-engineered freespan building in North America. Atop this building will be a solar panel array from Utah’s own Auric Solar, at roughly half the size of its Rio Tinto Stadium installation” and a high school for their academy players to attend.

Nutrilite Training Facility (San Jose Earthquakes) – 2010

Estimated total investment: “over $1 million”

From MLSsoccer.com: Built on the same site Avaya Stadium would later be built. “The Nutrilite Training Facility took four months to complete … It … is 72-yards x 115-yards. The square footage of the entire facility is 85-yards x 140-yards, including an area behind the goal for warming up and goalkeeper drills”. The above is from 2010 when the facility was first opened. It also says there is room to expand for more fields. A quick google maps search confirms that and that they have not added extra practice fields since 2010.

Starfire Sports (Seattle Sounders) – 2005 (since before they were in MLS)

Estimated total investment: Leased

From Seattle’s website: ” 54-acres of soccer heaven. The campus features twelve outdoor soccer fields, a 4,000-spectator capacity stadium, and an 85,000 square foot Athletic Center housing two premier indoor fields, locker rooms, restaurants, retail and athletic training” 13 fields, 8 of which are turf.

Pinnacle National Development Center (Sporting Kansas City) – 2018

Estimated total investment: $75 Million

From Pinnacle’s website: 5 soccer fields, three grass, two turf; A sports performance office including neuropsychology office, hyperbaric chambers, recovery room, massage suite and more; 12,870 square feet gym/workout room; a coaching education center; event spaces such as conference rooms, banquet halls, etc.

BMO Training Ground (Toronto FC) – 2012

Estimated total investment: $21 Million

From Toronto’s website: “14 Acres of land … BMO training ground represents a $21 Million investment made by Toronto FC and Maple Leaf Sports & Entertainment … includes three full size grass fields (two heated), four artificial fields, including two with air-supported bubbles for year-round use, and a 40,000 square foot field house that has locker rooms, training facilities and team offices. There is also a physiotherapy and rehabilitation area, private and cafeteria-style dining, and a video presentation centre”.

Whitecaps FC National Soccer Development Center (Vancouver Whitecaps FC) – 2017

Estimated total investment: $32.5 Million

From Vancouver’s website: “features a three-storey, 38,000 square feet state-of-the-art fieldhouse … five (three grass and two artificial turf fields) constructed, refurbished, and improved fields …The fieldhouse offers a number of exciting features including:

Two-story weight room with glass windows on one end and a fully-mirrored wall on the other, creating a stunning, panoramic view of the new grass fields and surrounding mountains.
Players’ lounge
Kitchen with individualized nutritional options for each player
A hydrotherapy-equipped sports science wing
A branch dedicated for UBC use
A specific entrance and workspace for media”.

Check out the rest of my series Profiling MLS Teams 2018

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s